Ultrasound machine debugging |
2016-06-28 |
|
(1) when the machine is in position, first check the measurement purification regulated power supply voltage is normal and accurate, and secondly to check the machine for transport process caused by the connector for circuit board of loosening, dislocation or damaged; check the monitor has no abnormal damage. These tests are necessary.
(2) of new machines don't need any adjustment can work; machines have been used to re install, you need to do some of the necessary checks, such as probe, available basic test method inspection probe is abnormal.
|
 |
|